Stacy Witbeck https://stacywitbecklive.azurewebsites.net/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This was a $181 million design-build project for a 6.5-mile double-track extension of TriMet’s light rail system. Scope included track work, at-grade crossings, earthwork, utility relocations, a cut and cover box tunnel, nine bridges, walls, eight stations, a multi-use path, four park-and-ride lots, an overhead catenary system, signals and communications systems, and civil to systems integration and testing.  

Project Awards:

Design-Build Institute of America Award - Transportation                         

ARTBA PRIDE Award                                                           

Daily Journal of Commerce Project of the Year Award  

Quick Facts

Location

Portland, OR

Project Type

Bridges and Highways, Light Rail, Parks & Public Spaces

Delivery Method

Design-Build

Date Completed

2010

Project Owner

Tri-County Metropolitan Transportation District of Oregon (TriMet)

Region

Northwest

/

"As an owner, having Stacy Witbeck as your General Contractor not only ensures that your job will get done on-time and within budget, but it also ensures that the local subcontracting community will receive a fair and equitable opportunity to participate and succeed."

Owner, Excavating Subcontractor