Stacy Witbeck https://stacywitbecklive.azurewebsites.net/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

Stacy Witbeck was the managing joint venture partner on this $199 million CM/GC project for a 5.5-mile extension of UTA’s light rail system. The alignment was partly located in a dedicated corridor and partly in city streets, with crossings over both the Jordan River and the I-215 freeway. The project included the construction of five bridge structures, including a 730 ft. steel girder bridge over an active Union Pacific railroad yard, four station platforms, MSE walls, public and private utility relocations, tie-in connections to the existing light rail system, and associated OCS and systems construction. 

Project Awards:

2009 and 2010 NRC Safety Awards

2010 AGC of Utah Transportation Project of the Year Award

2010 AGC of Utah Partnering Award

2010 ARTBA PRIDE Award

UDOT Excellence in Paving Award.

Quick Facts

Location

Salt Lake City, UT

Project Type

Bridges and Highways, Light Rail

Delivery Method

CM/GC

Date Completed

2011

Project Owner

Utah Transit Authority

Subsidiary Involvement

Modern Railway Systems

Region

Mountain

/

"Stacy Witbeck is in a league by themselves when it comes to attention to quality. The desire of their team to deliver only the highest quality work on all their projects is a validation of the trust UTA has put in Stacy Witbeck."

Quality Manager, Utah Transit Authority