Stacy Witbeck https://stacywitbecklive.azurewebsites.net/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This project consisted of constructing a new FrontRunner commuter rail station and a second track on the existing commuter rail line built by a Stacy Witbeck-managed joint venture. The station included the station platform, platform canopies, and associated amenities and systems. 

The station platform was constructed by extending the existing stem wall footing between the active tracks and finished with a topping slab and a hydronic heating system for snow melt. The track consisted of approximately two miles of a second UTA track west of the existing UTA mainline, a new turnout, a new at-grade crossing, and a new gravel access road. 

Union Pacific Railroad has tracks within this rail corridor to the east of the existing UTA tracks.

Quick Facts

Location

Vineyard, UT

Project Type

Commuter Rail

Delivery Method

CM/GC

Date Completed

2022

Project Owner

Utah Department of Transportation

Subsidiary Involvement

Modern Railway Systems

Region

Mountain

/

"Above all, safety took precedence, leading to the successful on-time completion of a project that will surely be a focal point of the city’s growth and development."

City Engineer, Vineyard