About the Project

Stacy Witbeck was a joint venture member on these design-build projects valued at $584 million. The Orange Line Expansion (I-1/I-2 and I-3) comprised three light rail segments totaling 14.4 miles, providing transit access to the Dallas-Fort Worth airport. The Orange Line included designing and constructing five signature light rail stations. 

The stations share common themes, yet each station has a unique look and feel designed to reflect the communities in which they are located. The projects included 18 aerial structures, ballasted, direct fixation, embedded trackwork, extensive retaining walls, roadway and utility work, and traction electrification systems.

Quick Facts

Location

Dallas, TX

Project Type

Bridges and Highways, Light Rail

Delivery Method

Design-Build

Date Completed

2014

Project Owner

Dallas Area Rapid Transit (DART)

Region

Central

/