Stacy Witbeck https://stacywitbecklive.azurewebsites.net/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This contract is to improve King County Metro Route 160 by installing RapidRide Stations in three cities in Seattle-Tacoma Metro: Renton, Kent, and Auburn. The 27-mile route will connect three major transit centers to better serve local residents and businesses. This project is one part of a system-wide initiative to improve commuter access in the south of King County. 

Need 

The route is planned to operate every 10 minutes during peak periods, every 15 minutes off-peak, and every 30 minutes late night. This will help meet a critical need for improved north-south transportation options in south King County, making it easier for passengers to travel to and from regional destinations and to access the network of local buses and trains. The BRT will serve enhanced transit connections with the RapidRide F Line BRT, the Sounder train in Auburn and Kent, and Sound Transit express bus service. 

Work 

  • 82 RapidRide stations with features designed to improve customer safety and comfort. 
  • Traffic signal improvements at 27 intersections. 
  • Lane priority with 12 Business Access and Transit (BAT) lane widenings for improved speed and reliability. 
  • 64 new or enhanced pedestrian crossings. 
  • Over 100 ADA-accessible curb ramps.

Quick Facts

Location

King County, WA

Project Type

Bus Rapid Transit

Delivery Method

Bid-Build

Date Completed

Ongoing

Project Owner

King County Metro

Region

Northwest