Stacy Witbeck https://stacywitbecklive.azurewebsites.net/Areas/CMS/assets/img/STW-logo.png California CSLB #414305,2800 Harbor Bay Parkway
Alameda, CA 94502
510.748.1870

About the Project

This was a $141 million CM/GC project to construct a 3.3-mile, double-track streetcar system. The project included approximately 2.5 miles of full-width roadway reconstruction and the complete replacement of the two bridges over I-75 and I-94. It also included 19 station platforms, OCS and traction power, train signal and communication systems, traffic signals, street lighting, and public and private utility relocations. This system has the most off-wire capacity of any streetcar in the U.S.. 

Project Awards:

ENR Midwest Best Projects – Award of Merit 

Michigan Concrete Association – Award of Excellence

Quick Facts

Location

Detroit, MI

Project Type

Bridges and Highways, Streetcar

Delivery Method

CM/GC

Date Completed

2017

Project Owner

M-1 Rail

Subsidiary Involvement

Modern Railway Systems

Region

Central

/

"We said Woodward Avenue would be ready in time for the annual parade, and it was. We had an aggressive schedule, along with a high standard for maintaining a clean and safe work site, and Stacy Witbeck's skilled construction crews rose to the challenge."

M-1 RAIL, Chief Operating Officer