Raising 32nd Street nearly 30 ft. above the at-grade BNSF freight rail line eliminates one of the busiest rail crossings in Washington. A new overcrossing bridge carries traffic above the tracks and lays the framework for a future third track. Completing in 2029, the project transforms a quarter mile of roadway into a modern, mixed-use corridor while advancing rail authority negotiations, construction permitting, and utility relocations.
Need
An average of 32 trains and roughly 5,700 vehicles cross the BNSF tracks at 32nd Street each day, with corridor capacity reaching up to 60 trains daily, making it one of the busiest rail crossings in the state. Frequent train blockages back up traffic, slow emergency response, and limit mobility for the Washougal community. Separating vehicle and rail traffic addresses this regional bottleneck and restores safe, reliable access through the corridor.
Work
Impact
Separating rail and roadway traffic improves safety for drivers, cyclists, and pedestrians throughout the corridor and gives emergency responders unimpeded access through Washougal. Eliminating the at-grade crossing removes recurring traffic delays, reduces vehicle emissions from idling and improves the reliability of freight and passenger movement. The project strengthens connections between SR 14, downtown Washougal, and the Port of Camas-Washougal Industrial Park while creating safer multimodal access and accommodating future growth in both roadway and rail traffic.
Washougal, WA
Commuter Rail
Design-Build
Ongoing
City of Washougal
Northwest